Yuye Electric will exhibit at the 51st 3E XPO 2026, which runs November 25 to 28 at the SMX Convention Center, MOA Complex, Pasay City, Manila. The booth is No. 206.
The display this year is built around automatic transfer switches. An ATS sits between the incoming supply and the load, moves the load onto a standby generator when the mains fails, and puts it back once the supply returns. Because that switch decides whether a building stays powered through an outage, the specification work behind it tends to be detailed.
Most questions come down to a few choices. Open transition breaks the connection before making the new one, which suits loads that can ride through a short break. Closed transition overlaps the two sources for a fraction of a second, for equipment downstream that cannot tolerate an interruption at all. Pole count follows the system, three on a standard three phase supply and four where the neutral is switched as well. Transfer time has to match what the load can actually ride through.
ATS units will be on the booth for all four days, with sales and technical staff there to go through them. Visitors who bring a single line diagram, a load schedule or a list of equipment can work through the sizing at the booth instead of exchanging drawings by email afterwards. Data sheets and wiring diagrams will be on site.
ATS units go into hospitals, data rooms, telecom sites, factories and commercial buildings, wherever the load has to keep running when the grid drops. Projects of that kind turn on transfer time, mechanical interlock and controller reliability, and the booth is set up to answer those questions directly.
Power interruptions are a routine design consideration in the Philippines, where typhoons and grid constraints put standby generation into a large share of commercial projects.
Buyers who want a fixed meeting time can send their requirements to _yuye@chinayuye.com__ before November 25. Walk-up visitors are welcome during show hours.
Show details:
51st 3E XPO 2026
November 25-28, 2026
SMX Convention Center, MOA Complex, Pasay City, Manila, Philippines
Yuye Electric, Booth 206
PC ATS YECT1-2000G
PC ATS YES2-63~250GN1
Solenoid-type ATS YES1-32~125N
Solenoid-type ATS YES1-250~630N/NT
Solenoid-type ATS YES1-32~125NA
Solenoid-type ATS YES1-63~630SN
Solenoid-type ATS YES1-1250~4000SN
Solenoid-type ATS YES1-250~630NA/NAT
Solenoid-type ATS YES1-63NJT
PC ATS YES1-100~1600GN1/GN/GNF
PC ATS YES1-2000~3200GN/GNF
PC ATS YES1-100~3200GA1/GA
Solenoid-type ATS YES1-63~630SA
Solenoid-type ATS YES1-63~630L/LA
Solenoid-type ATS YES1-63~630LA3
Solenoid-type ATS YES1-63MA
PC ATS YES1-630~1600M
PC ATS YES1-3200Q
Solenoid-type ATS YES1-4000~6300Q
CB ATS YEQ1-63J
CB ATS YEQ2Y-63
CB ATS YEQ3-63W1
CB ATS YEQ3-125~630W1
ATS controller Y-700
ATS Controller Y-700N
ATS Controller Y-701B
ATS Controller Y-703N
ATS Controller Y-800
ATS Controller W2/W3 Series
ATS switch Cabinet floor-to-ceiling
ATS switch cabinet
JXF-225A power Cbinet
JXF-800A power Cbinet
YEM3-125~800 Plastic Shell Type MCCB
YEM3L-125~630 Leakage Type MCCB
YEM3Z-125~800 Adjustable Type MCCB
YEM1-63~1250 Plastic Shell Type MCCB
YEM1E-100~800 Electronic Type MCCB
YEM1L-100~630 Leakage Type MCCB
Air Circuit Breaker YEW1-2000~6300
Air Circuit Breaker YEW3-1600
Miniature circuit breaker YEMA2-6~100
Miniature circuit breaker YEB1-3~63
Miniature circuit breaker YEB1LE-3~63
Miniature circuit breaker YEPN-3~32
Miniature circuit breaker YEPNLE-3~32
Miniature circuit breaker YENC-63~125
Load isolation switch YGL-63~3150
Load Isolation Switch YGL2-63~3150
DC relay YDC-P20
DC relay YDC-P250
DC relay YDC-P400
DC relay MDC-300M
DC relay YDC-M400
DC Isolation Switch YEGL3D-630
YECPS2-45~125 LCD
YECPS-45~125 Digital
CNC Milling/Turning-OEM
